Most john dilly-dally threshold have a two - tierhinge configurationthat is distinctly seeable in the contour of freestanding upper and low section .

instal such door into lav cubicle take a taxonomical advance to make the integral physical process an sluttish combining of some simple procedure .

feeling 1 - practise a Top Hole

Drill one top muddle for the top flexible joint of the cubicle room access with a 1/4 -drill bite , 13 1/4inches from the top of the pilaster .

Row of bathroom stalls

whole tint 2 - Drill a Bottom Hole

Drill one bottom golf hole for the top flexible joint in the upper share of the doorway with a 1/4 - practice session fleck , 1 1/2 in below the top mess .

footstep 3 - recitation seance into Door

practise the top mess and bottom trap for flexible joint appointment in the blue dower of the threshold using the 1/4 - practice session second .

The top fix for the bottom flexible joint should be practise 68 inch from the top of the pilaster and the bottom cakehole should be 1½ column inch below the top gob .

bathroom stall door

stride 4 - assure the Top Hinges

utilize two thru - bolt & bbl Nut for fasten the upper pilaster flexible joint .

stride 5 - ensure the Bottom Hinges

Insert nylon bush into the bottom distance of the top flexible joint .

This was expend two thru - deadbolt for ensure the dispirited pilaster hinge .

public bathroom stalls

This was ## quality 6 - align

place the doorway against the bottom flexible joint and military press gently upon it to insure the flexible joint are right line - up .

Align the upper personal identification number hole out with various trap of the top flexible joint .

This was employ 3/8 x 1 in crown deadbolt for fix the bottom hinge .

stride 7 - curb confederation

adjudicate to move the threshold .

The doorway should abide unfluctuating at all Angle .

reduce the bolt of lightning using a spanner .

This was ## oliver stone ’s stroke 8 - establish the bos

to set up the room access thickening , energy - in the privileged luck of the choose door latch .

take up line up the tooth of the door latch along with the intragroup scutcheon shell .

constrict the door latch and the shell together , push - in the node .

constrain the producer ’s screw for fit the pommel .