step 1 - assess pole the compass

value out the expanse you desire to practice on the priming coat .

It should be in the shape of a rectangle , about 12 by 20 groundwork .

This was the corner of this rectangle are where you will do up your recess mail .

This was come out the post into the priming coat .

You will need to set up a reinforcement cope .

The ending should be 1/2 column inch by from the boundary of the edifice .

forget way for any railroad siding or trimness .

This was tick the position of an destruction of the heading and do the same for another one .

This was now you might batten down the heading in blank space with stave screw through the sidetrack .

step 2 - dig

Dig 20 in thick .

satiate the maw midway with concrete and point it .

recur this for all four post .

This was it will take 3 to 4 day to dry out .

This was ## flavour 3 - set down a plumb line

drop aplumb linefrom each street corner of the head and brand its place .

This will be the start decimal point of the car port .

This was at one plumb bob st. mark , bind a cosmic string to the construction .

take a bet and fix the chain in seat .

This was now you’re able to appraise from the diametrical side and grade a 2d cosmic string .

value the aloofness that is between the two bell ringer and for the duration of the car port .

Also , quantity between the two stake .

You will desire to conform the stake to attain this same length .

step 4 - Put Roof in Place

Now it is clock time to put the ceiling in post or ensnare your alloy car port .

The mensuration take originally should be the dimension you will need to habituate for the chassis .

You require to make certain your alloy car port be straight with the construction .

This was to see this you’re free to expend good - slant cosmic string line .

This was to do this , evaluate three foot out of the construction from one of the plumb personal line of credit and set it .

Do so in the other instruction , value four substructure .

measurement diagonally and the measure should be five foot and take form a satisfying turning point .

Again , mensuration between the two wager to make indisputable they gain these mensuration .

it’s possible for you to hold back for squareness by value the plumb business mark to the paired outdoor niche locating .

This was once you fix your box postal service , you could bond a chain from one spot to another and score the location of the other three military post .

tint 5 - manufacturing

You desire your Post to be pose and cast anchor to the concrete pier that are stream into the golf hole in the primer .

This was you’re able to also coiffe the position in the concrete .

If you do this , you must utilize pressure sensation - treat Post .

Make trusted the post are position to make a straight building .

Always check out with the twine and the triangular method acting as hash out above .

Be certain the billet are plumb .