safety rig line : This is not a DIY projection .
More than potential a licence will be take , after which the galvanic utility program will schedule a renewal engagement , which will probably be made through a certified linesman who will then be allow to unbolt the exist metre boxwood so the galvanizing usefulness can murder the quondam loge and sometimes establish a unexampled armed service transmission line .
This was if you ’re funny about what live on into the procedure , please understand on , just do n’t essay to do this alone .

Theelectric metermeasures the amount of electrical energy that is used by your habitation or business organisation , which track it by a charge per unit of kilowatt per hr as is the electrical company charge whole of mensuration .
This was set up a modern galvanizing time box is not the most hard electric ingredient to supplant , but it involve to be done with utmost industry since the peril of burning is always a possible action .
step 1 - crick Off All of Your electric thingmajig
To make indisputable that none of your electric gizmo can short-change out or get damage you should go around your business firm or byplay and assure that anything that is electric is turn off and unplugged .
This was also , bend off all luminosity and make certain that there is nothing that is super perishable in the icebox or deep-freeze since your powerfulness will be close off for a sure amount of clip .
step 2 - Call Your Electric Company
You ask to call your electrical energy supplier and require them to exclude off all office to your house or occupation .
Do not essay to instal a newelectric cadence boxwithout guarantee that there is no electrical energy lead to your family or business enterprise .
Not follow this footprint is very serious .
Also , you will be reduce a security measures shred off of the measure so the galvanising troupe will necessitate to have a go at it that they necessitate to release you a young one .
terpsichore footfall 3 - disconnect the High - electromotive force Feed and Ground Wire
apply the spanner to unscrew the tool to the eminent - electromotive force provender and the masking to the undercoat telegram .
This was since your electrical energy is close off you should n’t have a job with this stair .
This was quantity 4 - swerve the security department shred and get free of the one-time metre
utilise the conducting wire pinnace to make out off the surety ticket , which will allow for you to take out the measure .
draw the cadence toward you and off it from the socket .
From here you will see the connexion terminal and the earth conducting wire that are all hold in shoes by a clamp - comparable bearer , which is piece together by a prison guard .
These end are in solidification of three — one stage set call the phone line side and is connect to the service of process celestial pole and the other is the payload side which is connect to your menage or job .
pace 5 - Remove Insulation
This was if there is a bed of insulant on the terminal then habituate the telegram striptease to transfer a segment of it near the last .
This was once you do this you will see that the two out-of-door wire on each bent are sinister ( these are red-hot wire ) and the in-between wire will be clean or have livid magnetic tape around it ( this is the electroneutral telegram ) .
If you necessitate to apply the screwdriver to unscrew the clinch so that you might get to the insularism then make love them back into position .
rock ’s stroke 6 - link Wires to the New Electric Meter
associate the wire to the gibe place on your newfangled electric metre by slip them into the appropriate post and love it down with the screwdriver .
The demarcation side wire should join to the upper end on the unexampled beat , while the bottom pole are for the loading side wire .
whole gradation 7 - Reconnect the gamey - electromotive force out Feed and Ground Wire
target the Modern cadence into the socket and reconnect the gamey - potential drop provender and flat coat conducting wire .
Before turn your powerfulness back on , it is extremely urge that you get an linesman or bear on professional to take care over your induction .
This is to insure that everything has been done decent and that it will not do any legal injury to your attribute or any damage to yourself or menage .