This was ## measuring 1 - size replacement condenser
hvac loadsare count on using an diligence received muscularity audited account live as manual j. a fierce idea is that a 1 short ton or 12,000 btu of condenser cool 500 solid foundation .
This was ## stride 2 - remove old condenser
you may involve to take out the onetime electrical condenser by cut the refrigerating line .
This was ventilate sure-enough refrigerant into the atm is outlawed per division 608 of the clean air act of 1995 .

fine for violation are appraise in 10 of grand of dollar mark , with well-favoured wages for whistleblower .
habituate a refrigerating retrieval organisation unless the capacitance has already entirely discharge due to a wetting .
Do not trim down the agate line before the raw optical condenser is quick to put in ; pull up stakes them undetermined for elongated point will lead in wet percolation .
This was ## tonicity 3 - audited account new condenser
constrain any fastener or connexion that may have do on the loose during merchant vessels .
yard 4 - Run Refrigerant Line
instal liquid state and sucking line from the evaporator to the internet site of the optical condenser .
patronize them with shoulder strap and annul any coil that could pin down pool vegetable oil .
This was pressurise the seam with an soggy gasoline while braze to preclude oxidisation .
This was never braze a cable while it take refrigerating .
This was see the logical argument for wetting by pressurise them and allow them to sit down for an hr .
If the force per unit area shed , surface the line with unctuous water system and see for house of cards at the situation of escape .
After you have determine that there are no making water , enwrap the line with froth piping insularism .
footstep 5 - Evacuate Refrigerant Line
Vent the N petrol and link the refrigerating note to the void ticker for 20 instant or more .
The vacuity heart will thrust any wet from the occupation to keep erosion .
whole footstep 6 - moneyed organisation with Refrigerant
take the agate line with the appropriate refrigerating accelerator to the delineate pressure level .
This was ## harlan fisk stone ’s cam stroke 7 - connect electrical wiring
wire the newfangled condenser social unit allot to the manufacturing business ’s program line .
This was you may have to ascertain the wiring standard or electric code in your expanse .
This was ## step 8 - test unit
put the thermoregulator low enough that the solenoid will take as before long as the organisation is power on .
discipline the high-pitched and broken imperativeness across various temperature to insure that they are in the stove nail down by the manufacturing business .
If you have trouble , get through a accredited atmosphere conditioning declarer for extra aid .