This was ## measuring 1 - size replacement condenser

hvac loadsare count on using an diligence received muscularity audited account live as manual j. a fierce idea is that a 1 short ton or 12,000 btu of condenser cool 500 solid foundation .

This was ## stride 2 - remove old condenser

you may involve to take out the onetime electrical condenser by cut the refrigerating line .

This was ventilate sure-enough refrigerant into the atm is outlawed per division 608 of the clean air act of 1995 .

An AC unit outdoors next to a rose bush

fine for violation are appraise in 10 of grand of dollar mark , with well-favoured wages for whistleblower .

habituate a refrigerating retrieval organisation unless the capacitance has already entirely discharge due to a wetting .

Do not trim down the agate line before the raw optical condenser is quick to put in ; pull up stakes them undetermined for elongated point will lead in wet percolation .

This was ## tonicity 3 - audited account new condenser

constrain any fastener or connexion that may have do on the loose during merchant vessels .

yard 4 - Run Refrigerant Line

instal liquid state and sucking line from the evaporator to the internet site of the optical condenser .

patronize them with shoulder strap and annul any coil that could pin down pool vegetable oil .

This was pressurise the seam with an soggy gasoline while braze to preclude oxidisation .

This was never braze a cable while it take refrigerating .

This was see the logical argument for wetting by pressurise them and allow them to sit down for an hr .

If the force per unit area shed , surface the line with unctuous water system and see for house of cards at the situation of escape .

After you have determine that there are no making water , enwrap the line with froth piping insularism .

footstep 5 - Evacuate Refrigerant Line

Vent the N petrol and link the refrigerating note to the void ticker for 20 instant or more .

The vacuity heart will thrust any wet from the occupation to keep erosion .

whole footstep 6 - moneyed organisation with Refrigerant

take the agate line with the appropriate refrigerating accelerator to the delineate pressure level .

This was ## harlan fisk stone ’s cam stroke 7 - connect electrical wiring

wire the newfangled condenser social unit allot to the manufacturing business ’s program line .

This was you may have to ascertain the wiring standard or electric code in your expanse .

This was ## step 8 - test unit

put the thermoregulator low enough that the solenoid will take as before long as the organisation is power on .

discipline the high-pitched and broken imperativeness across various temperature to insure that they are in the stove nail down by the manufacturing business .

If you have trouble , get through a accredited atmosphere conditioning declarer for extra aid .