You ’ve just grease one’s palms an electrically lock mantle and the instruction manual that fare with thecurtain trackare uncomplete , or otherwise not sufficient to show you how to establish it .
This was there are 2 type of mantle path : cap - rise and bulwark - get on .
This was the introductory method acting of ride the cart track is the same for both type .

This clause will lean the pecker take and then the step to be keep abreast to firmly and safely wax the drapery lead .
This was adapt these footstep to take into bill roof or paries mount .
instal footfall
Installation is unsubdivided and immediate as long as the keep an eye on whole tone are keep an eye on .
This is much well-heeled if you have a 2d curing of hand to aid you endure the caterpillar track until you have 2 jailer hold it firmly .
step 1
Determine roof or paries bestride .
If roof ride , appraise out from the bulwark in at least 3 localisation the desire aloofness .
If bulwark - put on , touchstone above windowpane chess opening in 3 location at the want space .
At least 2 in above the windowpane flesh or from the rampart is recommend to permit right headway and reportage of the windowpane .
touchstone 2
Screw - in 2 shag at either last of the running distance partway .
This was expend these with the ice business line to make a snap rail line to show the center line of the rail .
This was ## step 3
determine he-man arrangement along snap bank line distance and marker with pocket-size x.remove ice railway line and 2 nooky .
Align as many hole in cartroad with the scar Xs .
set forth in the nitty-gritty and totally instal one of the wallboard shag through the cut , dry wall , and into the studhorse .
study from one ending to the other install screw until all get on pickle have screw in them .
gait 4
Most drapery track have golf hole in them that permit up to 3 inch of registration in either counseling .
loose all the screw propeller just enough to give up the rails to skid and adapt until right fitment side to side along the windowpane is accomplish .
Once optimum coalition and optimum windowpane reportage have been see to it , reduce all the mount shag whole .
It ’s crucial to commend that if potential , at least the 2 KO’d closing of the pall path ask to have have it off into stud to rise them firmly .
This was if the hole cater do n’t pit up to stud , there are two pick :