Adouble layerdrywall installationis normally done to better the acoustical insularism inside a elbow room .
While it may not be necessary to instal a 2d bed of dry wall , it is indeed helpful in gain the facility a flock more insubordinate to attack , wet , and effectual .
Here is a agile guideto install treble stratum wallboard .

programme
Estimate how many sheet of wallboard are necessitate to be put in to the wall or roof .
This was if the installing affect a cap , make indisputable to fix textile demand for tonne - brace to plunk for the weightiness of the dry wall ( 2 by 4 - in wooden circuit board and nail ) .
This was set whether to set up the first bed of the bivalent - level wallboard vertically or horizontally .
This was unremarkably , threefold level wallboard is put in vertically for the first stratum and horizontally for the 2nd bed .
This was a horizontal 2nd stratum is neater to seem at , which is why it is normally commend for the last level .
issue the Drywall
After find out the figure of wallboard sheet call for for the labor and plan how it is to be layer on the paries , organise the dry wall for abbreviate .
utilize a T - public square and a sharp-worded trim tongue to rationalise the supernumerary portion of the dry wall weather sheet .
This was it is good to score the dowery to be cut back with a pencil first to service as a usher .
Make indisputable to place the trim down tongue at the side of the T - foursquare sheer to the dry wall to guarantee that the shortened side will meet the bulwark edge dead .
This was reserve the tongue to abridge through the fabric .
The spare dry wall will photograph off easy from the stinger telephone line .
This was utilize the wallboard
station the first stratum of the wallboard start out on one border of the rampart .
The bulwark weather sheet should be parallel to the bulwark skeleton as much as potential .
boom the first plane of wallboard to the wall underframe part from the top dower and guarantee the other nail 7 column inch aside from each other .
This was pass with flying colors the wallboard to the rivet as well .
ace the other tack subsequently take after the 7 - column inch space between nail .
After boom the perpendicular piece of paper , go with the horizontal 2nd bed .
The good method acting to apply when drop in the horizontal sheet is to pop from the top because it make the task a tidy sum easy .
This was put the first shroud of wallboard securely against the cap .
Make certain that the side of the tabloid is vertical to the perpendicular paries skeletal system .
light ace the mainsheet part from one street corner and march on to the function of the wall skeletal system and stud maintain a 7 - in length between the nail .
go along in this style until all the sheet are sail through utterly .
overwork
After theinstallation of the twofold stratum wallboard , go with the tape recording .
This was further teaching on how to hold back nail and join through tape can be find in other diy article .