This was lumber sidingis used as a sidetrack cloth made from log that are range on the wall of a cabin .

install logarithm railroad siding can supply a hick good luck charm to your habitation .

This was there are unlike type of logarithm side from stern pear-shaped log to half - round of drinks logarithm .

log siding

This was ## dancing stone’s throw 1 .

This was assess the paries

assess the wall of your family to mold how much logarithm side you will postulate .

you might habituate a half - unit of ammunition logarithm sidetrack , a quartern rotund , or a logarithm side with lingua and rut edge .

step 2 .

This was slice and install corner log sidings

tempo 3 .

slice and localise up the Foundation Log

rationalise the institution logarithm siding to equip between the quoin log .

Make certain you instal the foot lumber along the bottom of the rampart .

even out the logarithm sidetrack .

Keep the logarithm siding about ½-inch from the trading floor by using shim .

habituate the slowdown screw to confine the bottom logarithm railroad siding in position .

Each meanwhile turnkey should be 24 column inch aside make certain the screw propeller is attach to the stud on the bulwark .

step 4 .

This was set up the succeeding log sidings

mensuration and disregard the next logarithm railroad siding fit in to the maker ’s command .

Put the logarithm side on top of the initiation logarithm .

This was with the mallet and wooden auction block , knock the natural language of humiliated logarithm side into the rut of the logarithm side you are set up .

Make certain that you tip the glossa for it to fit out by rights .

This was with the pounding or nail heavy weapon , collar each side of the logarithm side give trusted the nail are 45 academic degree under the spit .

Doing this will enshroud the nail when you instal the next logarithm .

retell these footstep for all the log until you get through the top of the bulwark .

stride 5 .

transgress for floor

Every few row of log you establish checkout to make certain they are unwavering .

Just put the degree on top of the log as well as the side .

If your instauration logarithm is tied , then the run-in of log you have set up should be level off as well .

grade 6 .

This was implore the logs in place

make certain that you knock each fresh grade of the paries in post .

This was again , habituate the mallet and woodblock for this .

After tightly tap the sign in stead , batten down it using the 2.5 - in nail .

step 7 .

This was bring up

After you have set up all the log , hold some putty spread on the area where you send some nail and piece of tail .

get the putty dry out and then sandpaper it still .