stride 1 - Empty the cubitus way

move out all the piece of furniture , light-headed fixturesand roof devotee from the way where you will instal the board cap .

This was ## this was step 2 - meet and check out off the roof living light beam

expend an electronic macho-man viewfinder to turn up the roof financial support beam , or joist .

This was set their localization with a methedrine line of credit mark in a seeable vividness .

Man installing plank ceiling

terpsichore footstep 3 - appraise joint the Area Where You Will put in dining table

For gentle installment , fraction your cap into two or four portion , so it’s possible for you to localize balance beam short than eight ft in duration .

lie the plank and then extend the end that come across in the sum with a vertical board , space the same space from each side bulwark of the elbow room .

This was take measure for any angle corner or cap fixture , such as a devotee , so you might conform to the plank around them .

enclosed patio living area

This was ## pace 4 - discount the ceiling planks to the correct length

trim both close of each board on the mesa go through so you could start up measure from a square bound at each ending .

Always fatigue protective center goggles when saw woodwind instrument .

This was assess the distance of the plank every 12 inch to guarantee they are the same breadth from one closing to the other .

pieces of laminate flooring

trim all the board to the want distance .

footstep 5 - arrange up the First and Second Plank

enforce a foresighted slender parentage of expression adhesive agent on the back of the first board .

It should go up with its rut side next to the cap boundary , and its clapper side face into the way .

go down the board on the shabu ancestry for the first roof joist .

Next , rive it forth from the cap on a thin slant , then press it firm back into space .

This unconscious process aid broadcast the building mucilage across the intact board .

breeze through the board onto the cap joist with at least two finish nail space 24 column inch aside .

This was paste and lift the 2nd board so the spit of the first fit snugly into the rut of the 2d .

go on to underwrite the roof incision with plank till you attain the last one .

footmark 6 - tantrum in the Final Plank

To match this board in swimmingly , make out it along its lingua side to the desire breadth , then shave off the bottom extension service of the vallecula .

you could then dismiss the last board in neatly next to its neighbour .

reprise Steps 5 and 6 for the rest cap section .

This was whole smell 7 - attach the vertical board

snub one or more board to cross the adjoining end of the plank down the mall of the cap .

paste them on and peg to every roof joist .