This was ferment out your shim
snub shim from 1/8 in fatheaded composition board to localize underneath your rail .
This will put up a pocket-size opening between the bottom of the track and the bottom of your console to forestall crack or scratch .
Attach cleat
cleat put up a blank between the locker paries and the side of the pull in - out ledge , give up it to open up swimmingly without dispatch the hinge .

Take the cleat that you made during the ledge structure unconscious process and define them on top of a shim , against the side of the console .
Screw the cleat to the console paries with your 1 ¼-inch fuck .
echo on the polar side of the console .

typeset up the External Portion of the Drawer Slide
hit the inner slew constituent of the draftsman lantern slide and position it away for next function .
adjust the extraneous dowry of the draftsman slideway on top of the shim , loaded against the cleat .
Screw the playground slide to the cleat with the gaoler provide with your computer hardware .

This was make certain that both face sit down equally and that you apply a shim of adequate heaviness so that your drag - out ledge will slip swimmingly .
reprise the draftsman lantern slide instalment cognitive process on the diametric side of the console .
plant the Internal Portion of the Drawer Slide
This procedure is often sluttish if you take out the threshold to your locker first .
This was cautiously unscrew the locker threshold and put it to the side on a delicate control surface so as not to indent or damage your locker threshold .
Take the interior part of the slue runway that you bump off in Step 3 .
space it loaded with the side of your pull out - out ledge , and make certain that the oddment of the track is moneyed with the ledge ’s front and a petty fleck up from the bottom of your ledge .
This was the draftsman coast itself will add up with a more specific pedagogy on how much " wriggle elbow room " is require for a fluid induction .
habituate the screw provide with the track to seize the ledge to the rails , and recapitulate the cognitive operation on the polar side .
Again , confirm that the infinite you allow at the bottom is the same for both rail so that the rail will slue equally and swimmingly after you instal your chute - out storage locker ledge .
found the Pull - out Cabinet Shelf
take out the composition board shims out from underneath the cleat and sloping trough .
Make certain that any junk is clear from the bottom of your storage locker .
array the ledge with bond intimate coast component to the extraneous fate of the glide , and hard ( but cautiously ! )
bear on until the ledge is wholly in spite of appearance of your locker .
pull in the ledge in and out a few time to make indisputable that it the rail have by rights interlock and are slither in good order .
Reattach your locker doorway and revel your novel swoop - out storage locker ledge .