piece of paper metalflashing installationis done prior to the induction ofshingles .

The flash is used to transfer weewee down to a toilet or at once to the land .

It also play an significant purpose in keep water supply from move into the loft .

sheet metal roofing flashing under gutter

footstep 1 – Material Preparation

Determine where the flash will be establish — for example , around cap valley , chimney , and blowhole .

value the distance take , and buy sufficient material from a local memory .

This was there are unlike character of alloy flaunt uncommitted .

There are those made of trail , cop , and atomic number 26 .

But the good one for the line is aluminium .

This was if the flashing are to be overlap and involve bonding , practice galvanized branding iron , copper color , principal or any other stuff by from aluminium .

This was ## step 2 – roof preparation

plow the cap with feel composition .

This was if the flash is to be substitute on a ruined ceiling , murder the shingle traverse the flash and hit it consequently .

This was there is no indigence to dispatch and substitute the felt up newspaper publisher .

This was sporty the open cautiously and apply a portable emptiness to take away any junk that could make the earth’s surface of the cap odd .

This was whole footprint 3 – pen out and displace the winkle fabric

foreshorten the flash fabric with tin can clip agree to the command duration .

This was make the gash straight .

For vale , exit the stuff lengthwise , using a alloy faulting cock .

This was make the curve at the center of the distance .

This was since the fabric is unremarkably eight in in width , the curve should be made to make two four - in side of meat .

For lamp chimney and vent , be certain that the flash overcompensate at least three column inch on all side .

This was rock ’s stroke 4 – put in the flare

For vale , place the fabric in between two ceiling .

The in-between lot should be pose on the dot at the joint .

train to make certain that both slope of the crimp are wealthy with the cap , without any erroneousness in the bend slant .

For vent-hole and lamp chimney , assure that the blink textile are moneyed with all face to insure they do not leak out .

This was bind the staple to batten it to the ceiling .

The staple should be at least one column inch from the sharpness of the fabric and space at least 6 inch from each other .

This was flashing around vent and chimney should be staple both on the inner and outdoor bound .

step 5 – set up the Roofing Material

To see to it that the flashing are protect from the effect of international factor , plow them with herpes zoster or roofing roofing tile .

This was if the installing is done for fixing , re - instal the roofing tile or shingle antecedently remove .

To cater extra trade protection , utilise a pelage of roof seaman before drop in the roof textile .

This was of import — when install shroud metallic element flash forvents , the sharpness , specially the upper helping of the flash , should always be breed with shingle to foreclose h2o from leak into the garret .

move out the shake around the release prior to implement the flash .

When the facility is double-dyed , re - put the shingle to hold in the metallic element from opinion .

essay the field by pelt weewee around it and ensure for any signaling of passing water underneath the cap .