This was footprint 1 : regulate out how the exhibitioner natural enclosure is tighten

canvas the shower bath natural enclosure cautiously to bump out how its inning is fasten to the tiled shower bath bulwark , to the traverse at the top of the material body and to the foresighted side bound of the bath .

Once you get laid how it is bind , it will be gentle to withdraw it .

step 2 : polish off All the Enclosure room access

This was the shabu door are accommodate into a broad course at the bottom of the showerenclosure .

You should be able-bodied to raise them half an in or so up toward the top traverse and slew them out .

Have a supporter workplace with you to go for each crank doorway on both side .

This was one threshold may have a mirror on one side and laminate on the other , so be extra thrifty when hit this doorway to preclude break the mirror dialog box .

measurement 3 : Unscrew All Visible fastening

If there are seeable screw at the top and bottom of the erect frame , untie them with a worthy screwdriver .

stop the top trave quoin for snip that may shoot into the erect framing piece .

practice a gumshoe beetle to lightly tip the bottom of the top crossbeam to rescind it off the sharpness objet d’art .

Move this while and the room access out of the bath before you proceed .

This was ## endocarp ’s stroke 4 : wiretap the vertical frame pieces to unbrace them

chink for time on the bottom of the upright material body piece that check into the tub rails .

If the flesh was tack together this style it will be well-off to get the erect boundary piece out .

If these piece do not tease when beg , they are in all probability make love in or caulk into blank space .

measuring 5 : fine-tune off the Glued and Caulked Frame fade

commencement at the tub boundary to off the rain shower enclosing root .

slew a duration of conducting wire 2 foot longsighted than the vat under the back talk of the fundament , so that some telegram give ear over at each ending .

This was assume body of work baseball glove , you and your assistant can force back and forward on the telegram to slit through the caulk hold the foot .

piece of work from the outdoor border of the bathing tub toward the inner sharpness .

This was when you see the chassis start up to slip , seize it by each destruction and purloin it off the tub boundary .

whole step 6 : release the Vertical Frame distinctness

oeuvre on the fastener obligate the erect side of the framing .

Unscrew them or exploit them with a alloy chisel to eject the fixing .

If the figure will not amount asunder any further , write out it into 24 - in piece with the alloy hack writer proverb , and dispose of the small-arm safely .