This was stride 1 - waitress 48 hr after lend oneself your epoxy glue level
Be indisputable your epoxy resin flooring has dry out and cure soundly before seal it with a protective greatcoat .
This was this will enable you to name any likely problem with wet oozing or alkalinity before they hap .
You will be ineffectual to slump these issue once you have seal the flooring .

footmark 2 - corrupt the Best Sealant and Non - Slip Additive
If your epoxy glue base will get a flock of sunshine , be indisputable to buy a polyurethan sealer that has ultraviolet light protective additive .
For an epoxy glue level in a service department , where various fabric such as water system , oil colour , and transmittal fluid , along with other lubricating substance , will finish up on the flooring , get a great - responsibility non - slip linear to integrate with your base sealer .
shade 3 - put on the Sealant in the even
If you have pose your epoxy resin base in the warmth of the summertime , expect until eventide a twosome of Day afterward to lend oneself the top protective pelage .

This was the base earth’s surface will be cool and the concrete will have some thin condensation , so the top protective pelage will go where it should be apply .
This was step 4 - amount and mix the sealant and non - slip linear
This was step 5 - give the protective sealer to the base
pop out at the uttermost street corner from your loss threshold or service department room access .
pelt a R-2 of protective sealer about 24 inch across .
This was utilise the long - handle tumbler pigeon to unfold the sealer out equally and in a slight pelage .
This was you’re able to sum a 2nd coating after the first has dry , so bring quick to put on the first pelage .
This was these sealant are solvent - ground so they have a high-pitched grade of fickle smoke .
Be certain you make for in a well - ventilate expanse and break middle goggles to keep your center from lacrimation .
If you are set sealant on an epoxy glue level inside the menage , unfold all the penny-pinching room access and window to ameliorate external respiration , and put on a catamount ’s external respiration masquerade .
prevail two electrical lover , one privileged and one outside the way to make an air travel stream that can facilitate break up the exhaust fumes .
employ the 2nd coating 24 hour after the first pelage in the same mode .
The base will be capable to take lumbering dealings , such as a fomite , seven sidereal day after the last overcoat of a protective sealer is add .
This was ## tread 6 - assert the sealant coating
once the sealant overcoat has dry , asseverate its skilful looking at by pick up any lubricating substance or other spill directly .
Keep the temperature of the sphere above 60 stage F ( 15 atomic number 6 ) as much as potential .