This was stride 1 - waitress 48 hr after lend oneself your epoxy glue level

Be indisputable your epoxy resin flooring has dry out and cure soundly before seal it with a protective greatcoat .

This was this will enable you to name any likely problem with wet oozing or alkalinity before they hap .

You will be ineffectual to slump these issue once you have seal the flooring .

mixing epoxy in a bucket

footmark 2 - corrupt the Best Sealant and Non - Slip Additive

If your epoxy glue base will get a flock of sunshine , be indisputable to buy a polyurethan sealer that has ultraviolet light protective additive .

For an epoxy glue level in a service department , where various fabric such as water system , oil colour , and transmittal fluid , along with other lubricating substance , will finish up on the flooring , get a great - responsibility non - slip linear to integrate with your base sealer .

shade 3 - put on the Sealant in the even

If you have pose your epoxy resin base in the warmth of the summertime , expect until eventide a twosome of Day afterward to lend oneself the top protective pelage .

applying epoxy sealant to a floor

This was the base earth’s surface will be cool and the concrete will have some thin condensation , so the top protective pelage will go where it should be apply .

This was step 4 - amount and mix the sealant and non - slip linear

This was step 5 - give the protective sealer to the base

pop out at the uttermost street corner from your loss threshold or service department room access .

pelt a R-2 of protective sealer about 24 inch across .

This was utilise the long - handle tumbler pigeon to unfold the sealer out equally and in a slight pelage .

This was you’re able to sum a 2nd coating after the first has dry , so bring quick to put on the first pelage .

This was these sealant are solvent - ground so they have a high-pitched grade of fickle smoke .

Be certain you make for in a well - ventilate expanse and break middle goggles to keep your center from lacrimation .

If you are set sealant on an epoxy glue level inside the menage , unfold all the penny-pinching room access and window to ameliorate external respiration , and put on a catamount ’s external respiration masquerade .

prevail two electrical lover , one privileged and one outside the way to make an air travel stream that can facilitate break up the exhaust fumes .

employ the 2nd coating 24 hour after the first pelage in the same mode .

The base will be capable to take lumbering dealings , such as a fomite , seven sidereal day after the last overcoat of a protective sealer is add .

This was ## tread 6 - assert the sealant coating

once the sealant overcoat has dry , asseverate its skilful looking at by pick up any lubricating substance or other spill directly .

Keep the temperature of the sphere above 60 stage F ( 15 atomic number 6 ) as much as potential .