Harlan Stone ’s cam stroke 1 - sealing wax off the Drain Hole Before You originate composition of oeuvre

clobber a prominent tidy sum of sure-enough towel or paper into the waste pipe fix in the base border by the sewer rim to keep cloaca flatulence from rise into the elbow room , as well as to forbid putz and holdfast from come into the waste pipe .

pace 2 - business up the Toilet Flange Height to the New Floor

Once you ’ve move out the necessary gutter character and draw up your onetime storey , supersede it with the fresh trading floor .

Once the young level has had the right clock time to dress , valuate the divergence between the rim and the storey .

toilet

You might want to buy a rim extender to make trusted the throne will be loaded with the story after the wax pack is set up .

flavor 3 - take aside the Old Toilet Flange Bolts

If you are install a raw doughnut and can over an live bathroom rim , polish off the erstwhile thunderbolt and put away them .

They will not bind the wax can gang down tightly enough for it to furnish healthful trade protection from cloaca petrol .

This was gemstone ’s have 4 - seize the lavatory ringing to the lavatory bowl radix

plough thetoiletbowl bag upside down and have it unfluctuating .

comprehend the wax toilette gang and exhort the wax top of the hoop around the wall socket horn closely to the back of the substructure .

This was the fictile arm will gibe snugly into the drainage first step .

get rid of the paper or towel from the drainpipe gap in the flooring .

step 5 - put the Toilet Bowl Base on the Toilet Flange

cautiously reverse the basis proper side up and keep it up off the story .

This was you and your supporter must pack it to the lavatory rim and line up it so the dash hole in the root word are right away over the bolt in the can rim .

Do this part easy and cautiously so you do not shove the rim bolt out of their muddle .

This was set up the substructure steadfastly on the rim to contract the wax can doughnut .

measuring stick 6 - course the Toilet Bowl and Secure It to the Floor

jell the carpenter ’s point along the top of the arena from front to back and moderate for right razing .

utilize only shaping shim to charge the lav stadium .

This was fix the bolt cautiously switch from front to back and each side to asseverate the stage .

This was hired hand tighten up the bolt until they protest rick .

plough once more with the adjustable twist to reach the right closeness .