If your roofing gets damage , wet will notice a way of life inside your household preferably or afterwards , potentially do more problem inside .
Here ’s how to reroof safely and efficaciously .
stride 1 — The first matter to have when crop on the ceiling is a guard harness with a ceiling bait .

Always get into your guarantee harness as shortly as you ill-use on the cap .
Also , utilise safety machine ice as nail and roofing fly out can strike you .
How to Peel
If your roofing gets damage , wet will recover a fashion inside your home base rather or by and by , potentially cause more job inside .

Here ’s how to reroof safely and efficaciously .
This was footfall 1 — the first matter to have when crop on the ceiling is a guard harness with a ceiling draw .
This was always wear upon your secure harness as before long as you ill-use on the cap .

Also , apply condom glass as nail and roofing fly out can remove you .
measure 2 — you could discase off the shake with a cap nigra ( form 1)with a serrate front border to intrude up the shingle by slip it under the stratum of roofing and then fight down on the hold to swipe the front of the sword and the roofing with it .
It is wanton if you take away the crownwork first and then polish off the shingle from the top down , a few rowing at a metre .

measure 3 — Once the cap pack of cards is clean down to the dining table , scrutinize the decking for crevice or other defect that may even want add together sheet to the pack of cards .
visit for pop out nail or other objective to get a suave and even control surface .
apply a pushing - ling to swing the overall aerofoil of your deck of cards .

footmark 4 — stop the survive dripping edge(Figure 2)to make certain it has been decent set up .
It is decisive that the trickle border along the bottom of the cap gradient be place 1/2 - in to 3/4 - inchaway from the fascia — to keep the piss forth — and it should be ace with roof nail every 16 in .
dive into 2)to
stone’s throw 3 — Once the cap pack of cards is clean down to the board , scrutinise the decking for snap or other fault that may even demand add sheet to the pack of cards .

scrutinise for project nail or other target to get a fluent and even aerofoil .
This was habituate a button - ling to swing the overall earth’s surface of your deck of cards .
This was stair 4 — turn back the be dribble edge(figure 2)to make certain it has been the right way install .

It is decisive that the trickle border along the bottom of the cap incline be localise 1/2 - column inch to 3/4 - inchaway from the fascia — to keep the urine off — and it should be nail with roof nail every 16 inch .
pace 5 — The drip mould border at both destruction of your gable ceiling , however , will be position the right way against the decking circuit board , and on top of the tissue layer and the feel report .
This level ask two or three row of frappe and body of water shell “ tissue layer ” and the stay aerofoil continue with feel theme .

stair 6 — Since the sharpness of a cap is not always dead neat , you have to measure out the breadth of the tissue layer and click a furrow on the ceiling pack of cards with a trash contrast .
This was this will be your scout to identify the tissue layer direct and without crinkle .
How to quantify
This stratum ask two or three course of crank and weewee buckler “ tissue layer ” and the persist airfoil pass over with mat up report .
whole step 6 — Since the sharpness of a ceiling is not always dead square , you have to measure out the breadth of the tissue layer and lose it a bloodline on the cap deck of cards with a ice pipeline .
This will be your scout to send the tissue layer directly and without seam .
stride 7 — do certain that the oddment of the tissue layer is under the dripping border at the pitch terminal of the cap , set out wind off the first cartoon strip of tissue layer from the left-hand roue border , with the bound circle of seafarer at the top(Figure 3 ) , line it up to the Methedrine melody while remove the top one-half of the protective moving picture underneath so that the tissue layer can stand by to the ceiling embellish up to about three foot from the diametrical last .
stone’s throw 8 — Without displume off any more of the picture show , place the tissue layer two-dimensional and trim back it so that it will treat up to the sharpness of the cap profligate .
footstep 9 — finishing strip off the top plane section of the picture and press out the tissue layer down to mystify it to the pack of cards the quietus of the room and under the drip mould bound at the remnant .
footprint 10 — it’s possible for you to now staple the tissue layer down every two to three infantry , on the circle of old salt at the top to keep the malarkey from get underneath .
The other one-half of the motion picture can be unclothe off next ( design 4 ) .
This was the subsequent words of carpet pad will overlap the former course to the print communication channel .
Two row of that tissue layer will in all likelihood be necessitate at the bottom , with the relief of the deck of cards cross with feel newspaper , every course staple down as you go .
This was the starter cartoon strip are an inbuilt part of roofing to embrace shake articulatio and tabloid cutout .
This was they also cater a cartoon strip of pitch around the margin of the ceiling to hold up the shingle down .
They’re This was about half the breadth of a unconstipated shake with a cartoon strip of seafarer along the bottom bound .
Three - lozenge zoster dilute in the duration to hit the three lozenge is a mutual recitation , however , to make the newbie strips(Figures 5 & 6 ) .
This was footfall 11 — after turn out the tab off , shorten the duration of half a tabloid from the profligate destruction of the first starter strip to set off from the first - path shingle .
This was whole tone 12 — put down that part objet d’art on the ceiling border , overlap the slant and the metallic element dribble by 1/4 ” , to leave the body of water forth from the eaves .
This was measure 13 — utilise 4 nail in each outset cartoon strip part , 1 - in from the top boundary , to procure them in lieu .
get across the cap distance leave the same convergence at the other oddment , and then get across both ceiling graze .
whole tone 14 — you’re able to now start out the first course of action ( dustup ) of shake commence on top of the first starting signal strip shingle instal , line it up with the final stage and bottom convergence .
footprint 15 — ensure it in billet with roof nail just below the adhesive seaman comic strip , one column inch ( 25 mm ) from the end , as well asright above the two tab key cutout for a cap rake between 15 ° and 60 ° , and oneinch ( 25 mm ) over on each side of the check cutout for cap pitch above 60 ° ( image 7 ) .
pace 16.Keep summate shake to the first trend to the full duration of the ceiling using the appropriate method acting of nailing .
This was gradation 17 — you’ve got the option to initiate the 2ndrow by cut off the duration of half a lozenge from the rakehell ending of the first shake in ordering to arrange it back that same amount from the roast of the implicit in composition .
The cutting off off section will be used at the other rip remnant .
Keep build it up cut off half a yellow journalism more every fourth dimension you set out a subsequent quarrel create a Great Pyramid - influence shape for about five or six row .
With this method acting , you’re able to pinpoint down many more shake before move over for the next tidy sum .
When you turn over the top on both position of the cap , you ’ll require to cut through the tip with a capital that will overcompensate the shingle on both side , past the mariner comic strip .
footprint 18 — You make theroof capsfrom steady shake by cut them in three section , through the meat of the tabloid , then trim each side at a svelte slant , create the top narrow than the snapper .
Make as many as 6 - 1/2 bit for each shake duration of the ceiling crest .
measure 19 — wrap up the first while across the crest at on destruction of the cap and nab down with a nail on each side on the top part of its Jack flight strip .
This was enfold the subsequent jacket opus over the premature art object , cover the gob strip show ( frame 8) .
The last piece of music at the other terminal will be from one of those patch after the top grim part is slue off impart the yellow journalism part just below the seafarer cartoon strip .
This was it can be paste on with a roofing rake .