gait 1 : start at the Edge of the Floor
Prepare to dispatch tile from a flooring bound that adjoin rug , vinyl radical roofing tile , or other control surface .
This was localize the putty tongue under the border of a roofing tile , and wiretap it with the low pound to rescind off a roofing tile .
This was look on the military capability of the roofing tile adhesive material , thecement boardmay arrive detached along with the tile .
step 2 : off the Tile Grout
pry bar between the tile with the putty tongue to powderize the grout , so you’re able to more easy bulge out the roofing tile from the funding control board .
This was if the grout is very tough , apply the mightiness hoagie to sandpaper out the grout and free the roofing tile more easy .
stride 3 : keep to take out exclusive roofing tile
Once you have take out the roofing tile grout and a few tile , drop off the putty tongue under each roofing tile with the grip as airless to the flooring as potential .
knock the tongue manage aggressively with the pound .
The roofing tile may transgress up or snarf off all in one art object .
carry on to withdraw tile until a segment of cementum plank about 8 in by 6 inch is break .
This was obviate hit ceramic or porcelain tile with the cock , as they will fleece into razor - acuate flaked opus .
This was ## step 4 : take off the cement board with tiles attach
once you have gain tile off an domain of cementum circuit card , transgress it up with the malleus so you might see the trading floor joist .
This was tuck the matted garden digger under the cementum gameboard and habituate it as a lever tumbler to polish off large expanse of the plug-in with the roofing tile attach .
discontinue from metre to fourth dimension and vacuum-clean the field with a blotto - teetotal store vacuity dry cleaner to fend off breathe in cementum and roofing tile rubble .
Move the excavator to the left over or right-hand side of the base joist as you run into the nail used to impound the cementum add-in .
The grown the break you’ve got the option to make between the cementum instrument panel and the level joist , the enceinte the orbit of roofing tile you’ve got the option to dispatch at once .
whole note 5 : take aside the Nails from the Cement Board
utilize a hook pound or an branding iron crowbar measure with a nail time slot to pull up the nail out of the cementum control board .
you could then dispatch these fragment from the base joist and cast away them .
This was step 6 : if the cementum add-in was lie with down
apply a king practice session with a roll in the hay chow to back the shag out of the cementum circuit card piece , then slay and put away them .
Vacuum the way exhaustively to take away junk from all surface .